Repair backlog estimate

How the repair backlog estimate is calculated

The repair backlog estimate works out how much of each building component's service life has been used up and what renewing it would cost for your flat.

Calculation

  • Wear = years since the last renovation ÷ service life, at most 100 %.
  • A component's backlog = wear × reference cost (€/m²) × the flat's floor area.
  • The total backlog is the sum of the components' backlogs.

Building components and the values used

ComponentService lifeReference cost
Pipes (incl. wet rooms)50 years€890/m², Helsinki region €1,000/m²
Façade: render50 years€350/m²
Façade: render on insulation25 years€350/m²
Façade: terrazzo render80 years€350/m²
Façade: concrete elements50 years, from 1990 60 years€400/m²
Façade: brick (joint repair)25 years€200/m²
Façade: material not known50 years€350/m²
Windows and exterior doorswood 50 years, wood-aluminium 60 years€150/m²
Roofbitumen felt 30, rubber-bitumen 30, PVC 25, tile 45, profiled sheet 40, standing-seam sheet 60, not known 30 years€100/m²
Balconiesbefore 1990 40 years (50 with waterproofing), from 1990 60 years€125/m²
Lift25 years€50/m²
Heating system25 years€120/m²
Yard20 years€30/m²

The table shows Asunto-Osake Tulkki's own values used in the calculation. The tables of the Building Information Foundation's cards are not reproduced here.

Renovation status

  • Done (Tehty): wear is counted from the renovation year.
  • Done, year missing: the wear cannot be estimated, so the component is left out of the total and shown as such.
  • Coming (Tulossa): the housing company's maintenance needs report plans the renovation within the next five years. Wear is 100 %.
  • No renovation (Ei peruskorjausta): the documents have a renovation history, but the component has not been renewed. Wear is counted from the year of construction.
  • No information (Ei tietoa): the documents have no renovation history. Wear is counted from the year of construction.
  • New building: in a building under 15 years old, a component not yet renewed is not counted as backlog. Without a lift, the lift's share is €0.
  • Line renovation (linjasaneeraus) and pipe renovation are the same system, so they are counted once, from the later renovation year.
  • Bitumen felt laid before 1980, and the original pipes of a building finished before 1970, are treated as past their service life.
  • The service life of the façade, roof covering, windows and balconies depends on the material. It is read from the renovation and maintenance texts in the housing company's documents. If the documents don't say, the default life is used and the component says that the material is not known.

Sources

  • Service lives: Rakennustietosäätiö RTS RT 2025
  • Pipe renovation cost: Isännöintiliitto, Putkiremonttibarometri 2026
  • Other costs: Asunto-Osake Tulkki's own reference values

The repair backlog estimate is a calculated estimate based on the documents and reference values. It is not a condition inspection and does not replace the buyer's duty to inspect (selonottovelvollisuus).